Project Description

The 1.650mm ID and 100m long vent shaft liner was installed at the North Head site as part of the North Side Storage Tunnel project. It was designed to withstand 1.0 MPa external water pressure once in service. The liner was manufactured by RPC Technologies for Sydney Water.